×

Warning

JUser: :_load: Unable to load user with ID: 845

Integrated Water Project

A smart cooperation between Africa City of Technology represented in geotechnical Center, and Turkey represented in the Turkish Coordination and Cooperation Foundation,

suggested to complete water stations (about twenty-eight), where it was studied by engineers from Turkey and engineers from geotechnical Center in about nine states (Khartoum - Al Jazeera - Nile - River North Kordofan - Sennar - White Nile - Darfur states). This project aimed at areas suffers scarcity in water. This project was sponsored by Turkey, through this project we prepared a special laboratory water and training for the staff.


phases of the project

Phase - one in 2011-2012
Phase – two in 2012-2013
Phase – three in 2013-2014
The last phase beginning in 2016

Back to top